Home / Historical Hydroelectric Power Plant Equipment Engineering. /
HISTORICAL FACTS ABOUT THE JORDAN HYDRO-ELECTRIC POWER PLANT PAGE 2.
5/455
A Woodward hydraulic governor series VR 1500 was installed in 1918. This legacy governor is still located in the power house on static display. A digital PLC was installed in 1998.
0 comments