Home 55727
- Entering the man cave.
- Two tracks installed under the book shelves, two more tracks to go.
- The future train switching yards.
- The second phase of construction is installing the train tracks.
- Lots of organized reference documents for the OldWoodward.com hobby website.
- The installed train control panel.
- Looking under the control board with all the train operating layout wires.
- Looking out from the train control panel.
- Looking out from the train control board.
- Completed building the train control board, now just a few wires to install to make it all work.
- Back view of the control panel.
- The completed train control panel installed.
- The train control board.
- Side view of control board.
- Looking toward the Woodward governor collection.