- WGC PMC JUNE 1990
- WGC PMC JUNE 1990
- WGC PMC CTL JUNE 1990.
- WGC PMC CTL AUGUST 1990
- This train track is now painted a realistic dark brown.
- THE STORY OF MADISON 1836-1900.
- THE STORY OF MADISON 1836-1900.
- The first American Railroad. The Baltimore & Ohio Railroad. 1827-1927 history.
- The first 90 feet of track is now painted an expresso brown color.
- The first 4 cases of track cork roadbed has arrived.
- The brown painted train track is now drying outside.
- Ready to paint some model railroad train track brown.
- Ready to install the first 300 feet of cork roadbed for the track.
- PRIME MOVER CONTROL MARCH 1988.
- PRIME MOVER CONTROL AUGUST 1994.