- Finally nailing down some track after months of building the benchwork.
- Peanut!
- Peanut inspecting the six siga switch track components.
- Finally the new # 8 turnout switch tracks arrived from the backordered PO(longest radius turnout manufactured).
- Marking the centerline of the double mainline tracks.
- First few feet of cork roadbed glued down, ready to nail down the track.
- Figuring out where the tracks will go.
- Figuring out the track grade around the curves.
- Making the centerline marks to install the cork roadbed then the track.
- Track mock-up.