- 16
- Circa May 1942 during WW II.
- 12
- The first FJ44 fuel control system ships, circa 1992.
- The first few production FJ44 fuel controls in assembly.
- FJ44 ships !
- The first FJ44 fuel control system ships, circa 1992.
- Woodward's first FJ44 fuel control shipped in May 1992.
- 11
- Woodward makes history with the introduction of the Woodward FJ44 series fuel control system for the Williams International FJ44 gas turnine engine.
- 10
- SPOTLIGHT ON ... the Stevens Point facility.
- SPOTLIGHT ON ... the Stevens Point facility.
- Building for the future, circa May 1992.
- Preface. Thank you Ross for the great Wisconsin history lesson along the way.