Home / Vintage machine shop manufacturing history projects over the years. / More vintage machine shop manufacturing history projects from over the years. / Brad's model railroad train layout project. / Brad's old and new model railroad history. 30
Creation date
- The model railroad under construction.
- The model railroad under construction.
- Looking back at my 31 year old model railroad and a vintage 1960's Woodward aircraft engine governor.
- The first 4 cases of track cork roadbed has arrived.
- Looking back at over 35 years of operating the model railroad.
- ATLAS TOOL COMPANY'S TRACK.
- In the storage room staging track area that had a capacity of 65 train cars.
- The new GoPro camera to mess around with on the model railroad.
- A new little GoPro camera on a flat car ready to operate.
- In the storage room staging track area that had a capacity of 65 train cars.
- Traveling toward the high bridge(past the wall). The drop is 4 feet to the floor.
- On the old model railroad operating the new little video camera in 2018.
- A little Vivitar train camera working on the railroad.
- Looking back at hooking up a small camera to a train flat car and going thorough the model railroad.
- On the High Bridge coming out of the staging track yard in the storage room.