Home 24
Creation date / 2018 / All / 27
- Operating the new little video camea on the model railroad.
- Operating the new little video camea on the model railroad.
- Video taping the model railroad before taking it all down to move in 2019.
- On the High Bridge coming out of the staging track yard in the storage room.
- Behind the wall in the storage room staging track area that had a capacity of 65+ train cars.
- Operating the new little video camea on the model railroad.
- On the High Bridge coming out of the staging track yard in the storage room.
- A little Vivitar train camera working on the railroad.
- Looking back at hooking up a small camera to a train flat car and going thorough the model railroad.
- On the old model railroad operating the new little video camera in 2018.
- Traveling toward the high bridge(past the wall). The drop is 4 feet to the floor.
- Niagara Falls area factory history.
- Niagara Falls area factory history.
- 1993. 5.
- 1993. 6.