Home 84
Creation date / 2020 / April / 27
- 6
- The compressor inlet temperature and pressure components.
- Taking before and after pictures to remember how it all goes back together.
- Ready to cut off the lock wire and disassemble the governor flyweight assembly.
- Documenting the part locations to put back together after the disassembly.
- 2
- Ready to take off the upper casting part of the control.
- End of dissassembly project.
- Taking apart the speeder spring and pilot valve assembly.