Home 12545
Creation date
0
1899
1999
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
All
- On the High Bridge coming out of the staging track yard in the storage room.
- On the High Bridge coming out of the staging track yard in the storage room.
- Behind the wall in the storage room staging track area that had a capacity of 65+ train cars.
- Video taping the model railroad before taking it all down to move in 2019.
- On the old model railroad operating the new little video camera in 2018.
- Traveling toward the high bridge(past the wall). The drop is 4 feet to the floor.
- Looking back at hooking up a small camera to a train flat car and going thorough the model railroad.
- A vintage railroad locomotive machine shop manufacturing history project.
- 14
- Purchasing a GoPro video camera for the model railroad in 2017.
- The new GoPro camera to mess around with on the model railroad.
- The first small camera to use on the model railroad tour.
- A GoPro brand high-tech waterproof video camera ready to use.
- Another small camera to experiment with on the model railroad, circa 2018.
- In the storage room staging track area that had a capacity of 65 train cars.