Home / Vintage machine shop manufacturing history projects over the years. / More vintage machine shop manufacturing history projects from over the years. / Brad's model railroad train layout project. / Brad's old and new model railroad history. 30
Post date / 2022
« 2021
2023 »
January
February
March
April
May
June
July
August
September
October
November
December
All
- Looking back at over 35 years of operating the model railroad.
- In the storage room staging track area that had a capacity of 65 train cars.
- The new GoPro camera to mess around with on the model railroad.
- A new little GoPro camera on a flat car ready to operate.
- In the new office / model railroad / engine governor / library room.
- The new model railroad under construction in the 12' x 26' room.
- Walking toward the train room through the door opening.
- In the storage room staging track area that had a capacity of 65 train cars.
- Traveling toward the high bridge(past the wall). The drop is 4 feet to the floor.
- On the old model railroad operating the new little video camera in 2018.
- 2 vintage Stevens Point Brewery signs made into brewery garage shelving made into ceiling art.
- A little Vivitar train camera working on the railroad.
- Looking back at hooking up a small camera to a train flat car and going thorough the model railroad.
- On the High Bridge coming out of the staging track yard in the storage room.
- Operating the new little video camea on the model railroad.