Home / Historical Hydroelectric Power Plant Equipment Engineering. 135
Post date / All / Week 47
- This Woodward governor was in service for 46 continuous years with no upgraded equipment to the unit.
- The horizontal turbine water wheel system on the right side in the unit.
- Showing the original gate shaft disconnected when the unit was upgraded.
- Closeup of the governor control stand showing the linkage to the pilot valve and compensating dashpot system.
- In the left corner by the back wall was the location of the Woodward governor.
- Inside bottom of the unit.
- The 200 hp generator motor burned-out (5 months ago) ready to be rebuilt at L&S Electric Company.
- Inside the turbine unit looking up at the head gate opening with the trash grates removed.
- The turbine access cover removed.
- A light used inside to inspect the turbine unit for an annual inspection.
- The origal location of the Woodward governor driven off the main generator drive shaft shown.
- In the left corner by the back wall was the location of the Woodward governor.
- Brad asked to see inside the turbine unit, Mike unbolting the inspection cover.
- PXL 20221112 185307158
- Ready to power wash the inside of the unit.