Home / Historical Hydroelectric Power Plant Equipment Engineering. 9
Post date / 2020 / Week 18
- The Granite Creek Power Project Blueprint Page 2.
- The Granite Creek Power Project Blueprint, circa 1927.
- The Granite Creek Power Project letter, circa 1928. Page 2.
- The Granite Creek Power Project letter, circa 1928.
- Governor for the World Radio Missionary in Ecuador. Price quote.
- Governor for the World Radio Missionary in Ecuador, circa 1980.
- A Pelton type 0-5 governor removed and converted to a Woodward HT-UG8 governor control system.
- A Pelton type 0-5 governor removed and converted to a Woodward HT-UG8 governor control system.
- The HT-UG8 Woodward governor for small turbine water wheels.