- The water channel is empty to replace boards on the head gate 415 feet behind the camera.
- Opening to the Penstock at the right.
- Showing the trash racks going into the penstock at the right.
- A Wisconsin hydroelectric power plany history project.
- The 168 foot penstock for the turbine unit in the building.
- Looking down from 800 foot long water channel. The penstock is to the top right.
- THE BIG PLOVER MILLS POWER COMPANY AT THE JORDAN DAM.
- Mike Bigalke's Big Plover Mills Hydro Power Plant.
- THE BIG PLOVER RIVER POWER COMPANY AT THE JORDAN DAM.
- The 117 year old powerhouse (built in 1905).
- Looking down the 168 foot penstock.
- A Wisconsin hydroelectric power plany history project in 2022.
- The Big Plover River is on the right.
- A Wisconsin hydroelectric power plany history project.
- THE WATER POWERS OF WISCONSIN.