- The governor system in the Jordan Hydro Plant.
- The control panel.
- Mike showing the inside of the control system.
- The original generator and the upgraded pulley to the 200 hp. generator motor unit.
- The original generator and the new pulley to the 200 hp. generator.
- The water wheel drive shaft to the generator unit on the bottom right.
- The Gates 8 rib drive belt to the generator.
- Looking up at the original stone walls in the powerhoue that was built in 1904.
- The generator developing the electricity to sell back to the WPS Company.
- The original Allis-Chalmer generator no longer used (inside windings pulled away).
- The Gate 8 rib-12 foot drive belt from the water wheel shaft to the generator.
- The original Allis-Chalmers generator shaft is still used but not the old generator unit.
- PXL 20221112 185307158
- The original exciter DC generator motor not in use.
- The 200 hp generator motor burned-out (5 months ago) ready to be rebuilt at L&S Electric Company.